Complete Installation Steps of YW Liquid-Submerged Sewage Pump

Step 1 Pre-installation InspectionCheck pump body and motor for transportation damage, fastener tightness. Rotate pump shaft manually to confirm no internal friction noise, measure coupling concentric…

Specifications
Flow Rate​2 ~ 2000m³/h
Head​ 3 ~ 60m
Power​ 0.75 ~ 250kW
Inlet / Outlet Diameter25-400mm
MaterialCast Iron,SS304,SS316

Product Overview

Step 1 Pre-installation Inspection
Check pump body and motor for transportation damage, fastener tightness. Rotate pump shaft manually to confirm no internal friction noise, measure coupling concentricity, outer circle deviation ≤0.5mm.
Step 2 Fix Support Plate & Pump Body
Select round or square support plate according to sewage pool structure, install single pipe or double pipe extension assembly, hang pump body into pool and adjust submerged depth within 0.5~7m. Fix base bolt tightly.
Step 3 Pipeline Layout
Set independent support bracket for outlet pipeline, forbid pipeline weight bearing on pump casing. Connect flexible hose (single pipe) or steel hard pipe (double pipe). Install outlet valve and pressure gauge on pipeline.
Step 4 Electrical Configuration
Equip full-automatic liquid level control cabinet, direct grid connection or knife switch power supply is prohibited to prevent motor overload damage. Connect liquid level sensor to realize automatic operation.
Step 5 Test Startup
Close outlet valve first, power on to test motor rotation direction, confirm consistent with pump marked direction. Open pressure gauge valve, slowly open outlet pipeline valve to rated flow for formal operation.
Step 6 Post-installation Reminder
Avoid long-term low-head operation below 60% rated head, to prevent motor overheating burnout.

Need More Information?

If you need more technical information about YW Type Liquid-Submerged Sewage Pump or have any questions regarding installation, operation, maintenance and model selection, please feel free to contact the engineering and technical team of Haquan Pump & Valve. We will provide you with professional and thoughtful service wholeheartedly. Your full satisfaction is our top priority.

Typical Applications

  • Equipment installer
  • engineering construction team

Related Products