- Mount the pump on a flat, clean base able to carry its weight, with anchor bolts where it must be fixed. For quiet rooms, use vibration isolators under the base.
- Keep the motor above the pump. A vertical pipeline pump is not meant to be installed lying down unless it is the horizontal ISW.
- Support the pipes on both sides independently. The pump casing must not carry the weight of the pipework.
- Fit an isolating valve on each side, and a check valve on the discharge.
- Make the suction pipe short, with few bends, and tight against air leaks.
- Fill the pump and suction pipe with water and vent the air before starting.
- Check the direction of rotation with a short start. Swap two phases if it is wrong.
- Start with the discharge valve partly open, then open it to the duty point while watching the current.
- Check the seal, the noise and the bearing temperature during the first hours.
Flange sizes for ordering counter flanges are in our flange guide.