Installing a Vertical Inline Pump: A Practical Checklist
October 23, 2026 2 min read Haquan

- Mount the pump on a flat, clean base able to carry its weight, with anchor bolts where it must be fixed. For quiet rooms, use vibration isolators under the base.
- Keep the motor above the pump. A vertical pipeline pump is not meant to be installed lying down unless it is the horizontal ISW.
- Support the pipes on both sides independently. The pump casing must not carry the weight of the pipework.
- Fit an isolating valve on each side, and a check valve on the discharge.
- Make the suction pipe short, with few bends, and tight against air leaks.
- Fill the pump and suction pipe with water and vent the air before starting.
- Check the direction of rotation with a short start. Swap two phases if it is wrong.
- Start with the discharge valve partly open, then open it to the duty point while watching the current.
- Check the seal, the noise and the bearing temperature during the first hours.
Flange sizes for ordering counter flanges are in our flange guide.
Products in This Series
Pipeline Centrifugal Pumps & CDL Multistage PumpsPipeline Pumps for HVAC Chilled and Condenser Water Circulation
Vertical inline pumps for chilled water and condenser water loops in HVAC systems: what sets the flow and head, and why closed-loop pressure matters.
—
Flow Rate (m³/h)
—
Head (m)
—
Power (kW)
Pipeline Centrifugal Pumps & CDL Multistage Pumps60 Hz and Special Voltage Pipeline Pumps and CDL Multistage Pumps
Pipeline and multistage pumps for 60 Hz and 380, 440 or 460 V supplies. Why a 50 Hz pump overloads on 60 Hz and what to send us.
—
Flow Rate (m³/h)
—
Head (m)
Motors wound for 60 Hz and the site voltage
Power (kW)
Pipeline Centrifugal Pumps & CDL Multistage PumpsA, B and C Trimmed Impellers: Matching a Pipeline Pump to the Duty
The A, B and C at the end of a pipeline pump model mark trimmed impellers. How trimming lowers head and power, with the 40-250(I) family as an example.
—
Flow Rate (m³/h)
—
Head (m)
—
Power (kW)
Need a pump for your application?
Our engineers respond to technical inquiries within 24 hours.
Get a Quote