WQK Cutting Pump Installation – Step-by-Step Guide

Step 1: Prepare the Pit
Clean the pit of debris. Make sure the bottom is level. If it’s muddy, pour a concrete pad. The pump needs a flat surface to sit on.
Step 2: Attach the Discharge Pipe
Connect the pipe to the pump outlet. Use a flexible coupling to absorb vibration. Install a check valve to prevent backflow.
Step 3: Electrical Connections
Run the cable to the control panel. Connect the ground wire first. Then connect the three phase wires. Install overload protection.
Step 4: Test Rotation
Briefly power the pump to check rotation direction. If backward, swap any two phase wires. Run test for less than 30 seconds.
Step 5: Lower Into Place
Attach a rope or chain to the lifting handle. Lower the pump gently. Never lift by the cable. Position the pump so it’s fully submerged.
Step 6: Final Test
Run the pump and check flow. Listen for unusual noises. Verify the check valve works. Done.

Applications Summary:
installation guide, pump setup, electrical connection, submersible installation, commissioning
Thanks for reading from HAQUANPUMP. Need installation support? Contact our team.
Products in This Series
WQK Cutter Submersible Sewage PumpChopper Pump for Sewage Treatment – WQK40-15QG in Headworks
Headworks are the front door of a wastewater treatment plant. Everything that comes down the sewer arrives here — rags, plastics, sanitary products, you name it…
WQK Cutter Submersible Sewage PumpAgricultural Chopper Pump – WQK25-15QG for Livestock Waste
Farm waste is different from municipal sewage. It’s thicker, more fibrous, and loaded with bedding material like straw and hay. An agricultural chopper pump ne…
WQK Cutter Submersible Sewage PumpHigh Head Chopper Pump – WQK20-60QG Pushes 60 m, 7.5 kW
Sixty meters of head is no joke for a chopper pump. Usually, cutting pumps trade pressure for solids handling. But the WQK20-60QG manages both: 20 m³/h at 60 m…
Need a pump for your application?
Our engineers respond to technical inquiries within 24 hours.
Get a Quote